Cyrilla Mozenter, "the failed utopian"
October 28
through
December 6, 2015
Opening reception:
October 28, 2015,
6-8pm
![Cyrilla Mozenter, "the failed utopian XXI (to for is)", 2015, Industrial wool felt hand stitched with silk thread, 48 x 71.75 inches Cyrilla Mozenter, "the failed utopian XXI (to for is)", 2015, Industrial wool felt hand stitched with silk thread, 48 x 71.75 inches](http://s3.amazonaws.com/lesleyheller/exhibition_images/images/445/col9/3_tfu_XXI_to_for_is.jpg?1485557222)
Cyrilla Mozenter, "the failed utopian XXI (to for is)", 2015, Industrial wool felt hand stitched with silk thread, 48 x 71.75 inches